“Birecik Dam and HEPP”, which is the Largest Hydroelectric Power Plant Project Built Under “BOT” Model in Turkey, is Transferred to Elektrik Üretim A.Ş. with the Legal Assistance of Kasaroğlu Law Office

13 October 2016